Hi Chris,
Is your second feeder system in the same, or a different, Logical System Group? If different, then don't forget that the Order Type and Item Category need to be assigned for the second system.
Even if the LSG is the same, assignment might be needed, since it's possible to assign either at LSG or Logical System level.
Regards,
Dave