I understand the description of the statuses. However looking in our GTS system all of our materials are set to either NEW or Processed in SAP GTS System.
I ran a test and changed an existing material in our ECC system and sent it to our GTS system and it went from Processed in SAP GTS back to NEW.
Are there settings we can modify to for changes to existing materials to be updated to Changed in Feeder System rather than updating back to NEW?
Thank you,
Alison