We are using SAP ECC and SAP TM (Shipper Scenario) along with SAP GTS. Is it better to generate export custom declarations in SAP GTS through Performa invoice in SAP ECC or it should be created from Freight Order, as SAP has provided the standard integration between SAP GTS and SAP TM.
What parameters I should consider to take this decision?
Thanks