Hello Ravi,
the IDOC failure will be communicated between your mapping system and the GTS. I know no way to maintain it with the PPF configuration. And I can hardly imagine the way how the PPF configuration can be linked to the status messages of the IDOCS.
Sorry
Regards,
Thomas