Hello Team,
I have an order with 2 line items. And the sales order is in GTS block due to license determination. The actual error is like below.
Sales order# Blocked / Checked
Legal Services - Customs Document Blocked / Checked
10 Legal Control - Embargo Released / Checked
10 Legal Control - Sanctioned Party List Released / Checked
10 Legal Control - License Determination Released / Checked)----- Material 1
20 Legal Control - Embargo Released / Checked
20 Legal Control - Sanctioned Party List Released / Checked
20 Legal Control - License Determination Blocked (License Master)----- Material 2
Looking at the above error i went in GTS and i assign the required license for material 20 (Material 2) and save it after which in GTS i can see order is out of block.
Observation:
- When i release the sales order from GTS and check in ECC under Transfer Sales document i can still see Material 20 showing as Blocked (License Master) message as it is even though it is released from GTS.
ECC shows its Blocked under license it still allows me to create Delivery (which i guess it should not).--- Observation 1
- As soon i create delivery i can see the message in Transfer Sales documents changed as Release/Checked for Material 20. --- Observation 2
- Can i assign license to individual materials? As per license determination i can see all my parameters are maintained then still material 20 showed me blocked but material 1 didnt show any such message.
Just want to understand which is the standard behaviour Observation 1 or Observation 2.